Home/ Blog/15 Best free VPN software for PC

15 Best free VPN software for PC

logo Hidemyacc circle

Looking for the best free VPN to keep your online activity safe? There are a few solid options out there that can help you browse the internet privately and securely without spending a dime. Whether you're looking to protect your data on public Wi-Fi or access content from other regions, free VPNs can be a good starting point. In this guide, we’ll share some of the top free VPNs you can use to stay secure and anonymous online.

1. Avira Phantom VPN

Avira Phantom VPN is a free VPN software developed by a renowned German security company. Known for its reliable encryption and robust privacy protection, Avira offers strong security for mobile devices, laptops, and desktop computers.

  • Compatible devices: Mac, Windows, Android, iOS. 
  • Free data limit: 500MB/month (If you register as a member, it will increase to 1GB/month).
  • Server location: More than 1400 servers in 37 countries.
  • Device connections: No device limit 
  • Download Avira Phantom VPN software here.
Avira Phantom VPN software is highly appreciated by users for its data encryption capabilities 

2. AtlasVPN

Despite having a limited number of server locations, Atlas VPN stands out as one of the few free VPN software options with unlimited usage. This software also allows users to connect across multiple platforms without restrictions.

  • Compatible devices: Windows, Mac, iOS, Linux, Android, Android TV
  • Data limit: Unlimited 
  • Server location: 3 server
  • Device connections: Unlimited 
  • Encryption: AES-256 standard
  • Download software AtlasVPN free of charge here
With Atlas VPN, you can freely use the capacity without limitation

>>>Learn More: What is SSL VPN? A complete guide to secure remote access

3. VPNBook

VPNBook is a completely free VPN software from Switzerland, known for its strong privacy features that allow users to browse platforms without exposing personal information. However, setting up VPNBook can be challenging for beginners, so users may want to consider this before downloading. 

  • Compatible platforms: OpenVPN, PPTP, Outline VPN Client, iOS, Android, MacOS, Ubuntu and other multi-platform.
  • Data limit: Unlimited 
  • Server location: 6 servers (from North America to Europe)
  • Encryption: AES-256 and AES-128 standards
  • Download the software for free here
VPNBook allows users to connect on many different devices

4. ZoogVPN

ZoogVPN is a free gaming VPN from a US-based provider that helps users hide their IP addresses, encrypt connections, and protect personal information while browsing the internet. With stable speeds and multiple server locations worldwide, ZoogVPN makes it easy for users to access foreign game servers.

  • Compatible devices: Mac, iOS, Windows, Android, Android TV, Linux, Fire TV. 
  • Free data limit: 10GB/month 
  • Server location: 6 server 
  • Device connection: 1 device
  • Download software ZoogVPN free of charge here
For ZoogVPN, users get 10GB/month for free

>>>Find Out More: 7 Best free VPN for iOS 2024

5. Opera VPN

Opera VPN is a free VPN software integrated directly into the Opera browser, offering unlimited bandwidth and data. It allows users to hide their IP addresses and access geo-blocked websites. While Opera VPN doesn’t secure your entire device’s connection, it remains a convenient and straightforward solution for safe browsing.

  • Compatible devices: Any device using the Opera browser.
  • Data limit: Unlimited.
  • Server location: 3 geographical locations, 100+ servers.
  • Encryption: 256 bit.
  • Download Opera VPN software for free here.
Opera VPN is built into the Opera browser

6. PrivateVPN

PrivateVPN is a free VPN changer software designed to help users browse the internet safely and privately. Headquartered in Switzerland, PrivateVPN places a strong focus on privacy and security, offering free versions to enhance user experience. 

  • Compatible devices: MacOS, iOS, Windows, Android, Android TV, Fire TV, Apple TV. 
  • Free data limit: 10GB/month.
  • Server location: 338 servers in 47 countries.
  • Device connections: 10 devices.
  • Encryption: 256-bit AES standard.
  • Download the software for free: https://privadovpn.com/
Privado VPN allows users to access the Internet securely

>>>View More: Best free VPN for Android: Top 9 services to try in 2024

7. Proton VPN

Proton VPN is a free VPN software for PC, Mac, smartphones, and routers. With over 2,100 servers in 67 countries, Proton VPN enables users to hide their IP addresses, limit online tracking, and safeguard their privacy.

  • Compatible devices: Windows, MacOS, Linux, Chromebook, Android, Android TV, iOS, and supporting devices such as PCs, Macs, smartphones, routers.
  • Free data limit: 10GB/month.
  • Server location: 338 servers in 47 countries.
  • Unblocking platform: YouTube, BBC iPlayer, Netflix, Hulu.
  • Security features: DNS, kill switch, split tunneling.
  • Download Proton VPN software for free: https://protonvpn.com/
Proton VPN has over 338 machines in just 47 countries

8. CyberGhost VPN

CyberGhost VPN is a free VPN software for PC, smart TVs, Android, Apple TV, and other platforms. With an extensive server network spanning over 100 countries, CyberGhost VPN ensures user security and a stable connection speed.

  • Compatible devices: Amazon Fire TV, Android, Android TV, Apple TV, Console, Chrome, Firefox, iOS, Linux, macOS, Smart TVs.
  • Device connections: 7 devices with just 1 account.
  • Server location: 11,000 servers in 100 countries.
  • Encryption: AES 256-bit standard.
  • Security features: OpenVPN, IKEv2, WireGuard.
  • Download CyberGhost VPN for free: https://www.cyberghostvpn.com/
Users can be completely assured about CyberGhost's security mode

9. Planet VPN

Planet VPN is a free VPN software, ideal for iOS, that offers high security and online anonymity. With strong encryption and a strict no-logs policy, Planet VPN enables users to connect to five different servers without data or speed limits. 

  • Compatible devices: iOS, Windows, Android, MacOS, Opera, Chrome, Router.
  • Device connections: 5 devices.
  • Server locations: 1260 servers in 60 countries.
  • Encryption: 256-bit.
  • Security features: OpenVPN, IKEv2, L2TP.
  • Download Planet VPN for free here.
Planet VPN is one of the best free VPN software for iOS

10. Betternet VPN

Introduced in 2014, Betternet VPN initially faced concerns about security vulnerabilities. However, the software has since undergone significant improvements, now offering strong data encryption and a stricter privacy policy to ensure safer browsing.

  • Compatible devices: iOS, Windows, Android, MacOS, Opera, Chrome, Router.
  • Free data limit: 500MB/month.
  • Encryption: 256-bit.
  • Security features: traffic volume, IP address.
  • Download Betternet VPN software for free here.
Betternet VPN helps users improve software security

11. ZenMate

Launched in 2013, ZenMate is a free VPN software compatible with Android, Windows, iOS, and various browsers. ZenMate offers comprehensive security solutions, including private browsing with advanced features such as a no-logs policy, automatic disconnection on network issues, and DNS leak prevention.

  • Compatible devices: Windows, macOS, iOS, Android and on Chrome, Mozilla Firefox, Edge and Opera browsers.
  • Server Location: More than 77 servers around the world.
  • Device connections: No limit.
  • Download software: https://zenmate.com/.
ZenMate is software for Windows, macOS, iOS, Android and other web browsers

12. ExpressVPN

As one of the world’s leading VPN service providers, ExpressVPN is renowned for its commitment to user privacy. Based in the UK, ExpressVPN continuously enhances its features to meet the evolving needs of users seeking secure online access. 

  • Compatible devices: MacOS, Windows, Android, iOS, router, Linux.
  • Device connections: 8 devices.
  • Encryption: Military-grade AES-256.
  • Security features: Does not save access logs, Lightway tunneling protocol.
  • Download free VPN software here.
ExpressVPN is one of the world's largest software providers

13. Windscribe VPN

Windscribe VPN is a free VPN software that helps users protect their privacy and access restricted content on the internet. It provides encrypted connections, boosts connection speed, and enables access to geo-restricted websites. 

  • Compatible devices: Windows, macOS, Linux, mobile devices and tablets running iOS and Android operating systems.
  • Server location: More than 100 servers across 60 countries
  • Device connections: 10 devices 
  • Encryption: AES-256 
  • Security features: Prevent DNS leaks, OpenVPN protocol, protect privacy, block unsafe websites and harmful content,...
  • Download Express VPN for free here.
Windscribe VPN helps increase user connection speed

14. TunnelBear

TunnelBear impresses users with its playful bear icon and interactive map, making it easy to connect to servers worldwide. This free VPN software allows users to download HD videos quickly, share connections for specific applications or websites, and prevent hackers from tracking activities across all platforms. 

  • Compatible devices: iOS, iPhone, iPad, MacOS, Windows and other browsers like Firefox, Chrome, Edge. 
  • Server location: 5000+ servers, 47 countries
  • Device connections: Unlimited
  • Encryption: AES-256 bit.
  • Security features: Do not monitor or sell user data, restrict access.
  • Download the software for free here.
TunnelBear makes it easy to connect to servers around the world

15. Hide.me

Hide.me is a free VPN software that provides unlimited server access across various countries. With an intuitive, user-friendly interface, Hide.me allows quick server connections and ensures fast, stable internet speeds, making it an ideal choice for VPN beginners. 

  • Compatible devices: Windows, Android, Android TV, macOS, Linux, iPhone, iPad, Amazon Fire TV and Chrome, Firefox, Edge browsers.
  • Device connections: 10 devices at the same time 
  • Technology: Bolt combined with WireGuard helps fast connection speeds, supporting IPv6
  • Security features: Do not save access logs, Lightway, StealthGuard, Advanced IP Leak tunneling protocols
  • Download software here.
Hide.me supports users to connect data quickly and effectively

16. Should I use VPN Free software to manage multiple accounts?

Free VPN software can help prevent unauthorized access to your information when using public or unsecured internet networks. By creating a private network, VPNs allow users to browse securely, making it harder for others to steal data.

However, for those in the make-money-online (MMO) field, free VPN software may not be the best choice for managing multiple accounts. While VPNs change the system-wide IP address, all applications and browsers on the device will share this IP, making it difficult to run multiple profiles simultaneously. Switching IPs for each account requires disconnecting and reconnecting to a new server, which can be time-consuming.

To address this limitation, using a proxy is a better solution for changing the IP for each profile, allowing each one to run with a unique IP. For added anonymity, combining a proxy with an antidetect browser like Hidemyacc offers a smart and effective tool for MMO professionals who need to manage multiple accounts.

  • Change Browser Fingerprint browser: If you combine Proxy with your software Hidemyacc, users can easily anonymize and change browser information, fingerprints (Browser Fingerprint), IP address and operating system when operating. 
  • High security: Hidemyacc provides users with absolute security features, helping users protect data information safely. 
  • Manage multiple accounts: When combining Proxy with Hidemyacc, users can easily manage multiple accounts at the same time on one device without worrying about being detected or blocked.
Hidemyacc software helps you manage multiple accounts without being detected

Not all VPNs offer the same experience, and this is especially true for free services. The best free VPNs typically come with limitations, like restricted features and fewer server locations. They're designed to give you a taste of the service, encouraging you to upgrade. Free VPNs often lack advanced features like rotating IPs, which makes them less effective for unblocking content. While they offer basic protection, they can’t match the full benefits of premium VPNs, which offer enhanced security and access.

Above, we have recommended the best free VPN software options available on the market today. However, if you need a secure solution to manage multiple accounts without detection, consider using a proxy combined with the Antidetect Browser Hidemyacc instead of VPN software. Download Hidemyacc now and enjoy a free 7-day trial!

Read more:

Ads

Read more

DataImpulse Review: User Experience and Proxy Performance

DataImpulse Review: User Experience and Proxy Performance

DataImpulse offers several proxy types and a range of features for users who need reliable IP connections for different online tasks. But how well does the service perform in practice, and is it worth considering? In this DataImpulse review, we examine its proxy types, pricing, features, refund policy, and user feedback on G2. We also test the service firsthand using the Intro plan across the US, UK, and Germany, evaluating IP location accuracy, access to websites such as Google, Amazon, and eBay, connection speed, and traffic consumption.

logo Hidemyacc circle
Black Friday proxy deals 2026: Coupon codes and discounts

Black Friday proxy deals 2026: Coupon codes and discounts

This page collects the Black Friday and Cyber Monday 2026 coupon codes and discounts from proxy providers in one place. Black Friday falls on November 27, 2026, and Cyber Monday on November 30, 2026. Many providers start earlier and run their offers through the whole Cyber Week, so check the "Valid until" date for each deal.

logo Hidemyacc circle
IPcook Review 2026: Is It Worth Buying? Detailed Analysis

IPcook Review 2026: Is It Worth Buying? Detailed Analysis

IPcook has gained significant attention among users looking for proxies for web scraping and multi-account management. This review provides an in-depth evaluation of the provider, covering core features, pricing plans, configuration on Hidemyacc, and live testing results for Residential and ISP proxies to help you make an informed decision.

logo Hidemyacc circle
SX.org Review: Real-World Testing of Mobile and Residential Proxies

SX.org Review: Real-World Testing of Mobile and Residential Proxies

Many people look for proxies on proxy marketplaces because of their competitive pricing and diverse IP pools, but whether the actual quality is as consistent as advertised is another question. SX.org is one such platform, offering Mobile, Residential, and Corporate Proxies alongside its own IP cleanliness rating system. In this review, I purchased and tested both Mobile and Residential Proxies, evaluating anonymity, speed, blacklist status, and CAPTCHA performance based on real-world results. Before getting into the tests, let us first look at what SX.org is, how users rate the platform, and what the service offers.

logo Hidemyacc circle
Browserscan review: features, accuracy, and pros/cons

Browserscan review: features, accuracy, and pros/cons

Changed your proxy but still facing account checkpoints? The issue might not be your IP address. Browsers silently share background technical details with websites, and Browserscan helps you uncover exactly what data is leaking. This article provides a comprehensive review of Browserscan, analyzing its fingerprint detection features, WebRTC checks, and Authenticity Score reliability. Learn when to use this tool alongside browser profiles to keep your account environments safe.

logo Hidemyacc circle